Skip to content

The Cost of Speed: Why Compressed Construction Schedules Are Quietly Driving Safety and Budget Risk

Dragan Savic

January 9, 2026

Construction safety practices

One trend has become nearly universal across construction. Compressed schedules are now the norm, not the exception. Owners want completion dates moved up. Supply chains remain unpredictable. Labor availability is inconsistent. Every superintendent and project manager I talk to feels the pressure to deliver more work in less time.

Here is the part we need to say out loud. Compressed schedules can not only increase safety risk, but can also quietly inflate total project cost. This happens not because people intend to cut corners, but because the pace of the work exposes coordination gaps that can become expensive very quickly.

Across hundreds of projects, the same pattern appears over and over. The good news is that it is both predictable and preventable.

When schedules compress, downtime becomes significantly more expensive

A one day delay on a fast track schedule is not a normal one day delay. When work is stacked tightly, every hour becomes expensive. Industry research shows that downtime on commercial projects can quickly escalate into significant daily costs once subcontractor standby, equipment rental extensions, crew remobilization and cascading delays are included. 

The real costs usually show up in places like these:

  • Subcontractors stacked in the same work area
  • Equipment sitting idle because a prerequisite task was not completed safely
  • A missed inspection or missed test pushing a sequence 24 to 48 hours

These are not isolated safety issues. They are cost overruns that become part of the schedule the moment it compresses.

Supervisor overload can lead to expensive oversights

When schedules tighten, oversight tightens too. Superintendents, foremen and safety leaders suddenly take on more workers per day, more overlapping scopes, more documentation, more coordination with QA/QC, engineering and trades. It is easy to understand why things slip.

McKinsey’s construction productivity research points to coordination complexity as one of the most common drivers of cost overruns. Compressed schedules make this complexity worse.

On site, it looks like:

  • JSAs that are incomplete or done too quickly
  • LOTO ownership that is unclear
  • Temporary power checks that get delayed
  • Confined space controls that are not verified early enough
  • Near misses that are noted but not investigated
  • Teams operating in reaction mode instead of prevention mode

These small breakdowns lead directly to rework. According to industry research, rework is a significant contributor to cost overruns, and is commonly estimated to account for roughly 5–10% of total project cost on average.  That is a large percentage of margin disappearing silently.

A minor incident becomes a major cost when the schedule is already compressed

On a relaxed schedule, a small incident may create small disruption. On a fast schedule, the same incident becomes much more expensive. OSHA and NIOSH cost models, combined with Liberty Mutual’s Safety Index, show that indirect costs often multiply the direct costs by several times, particularly once productivity loss and schedule impacts are considered.

For a “minor” incident, total cost can escalate quickly once you factor in:

  • Crew downtime
  • Equipment rescheduling
  • Subcontractor delay claims
  • Rework
  • Increased supervision
  • Slowed production for the next several days

One sprain, one piece of dropped material or one incorrectly protected trench can affect an entire sequence.

Documentation risk is an underestimated budget drain

As OSHA increases its focus on accountability and documentation, compressed schedules create predictable administrative gaps. These include:

  • Daily JSAs that are incomplete
  • Missing equipment inspections
  • Hot work permits without signatures
  • Subcontractors using outdated safety plans
  • No documented verification of LOTO steps

OSHA’s current maximum penalties:

  • Up to $16,550 dollars for a serious violation
  • Up to $165,514 dollars for a willful violation

The fine is rarely the biggest number. A stop-work event can quickly create substantial daily cost exposure once schedule impacts, crew downtime, equipment standby, and remobilization are considered.

On a compressed timeline, these disruptions hit much harder.

Safety needs to be embedded from beginning to end, not only during high risk phases

There is a misconception that additional safety support is only needed during high risk activities. In reality, with compressed schedules, the entire project becomes high risk because oversight demand increases from day one.

The projects that stay stable and profitable are the ones that embed safety professionals from beginning to final commissioning. Consistent presence provides:

A steady level of risk control

Instead of reacting to issues, the team prevents them by identifying hazards early, validating controls and keeping documentation clean throughout the job.

Relief for supervisors and field leaders

When supers and foremen are overloaded, mistakes occur. Adding dedicated safety capacity allows project leaders to focus on planning, sequencing and quality.

Continuity

Short term support during select phases helps, but it does not replace continuous oversight across pre-construction, mobilization, structural work, installation, commissioning and turnover.

Objectivity from a third party partner

This is one of the most overlooked advantages. An external safety professional brings an unbiased view that internal teams often cannot provide. External eyes see different patterns, question assumptions and identify blind spots that may go unnoticed by teams who are deep in the project every day. The goal is not to police the work. The goal is to provide a neutral, steadying perspective that protects people and keeps the schedule moving.

A lower overall cost than incident driven disruption

A dedicated safety professional costs far less than a single stop work event or a significant rework cycle. Many teams understand this intuitively but underestimate the magnitude of the avoided cost.

Bottom line

Compressed schedules are not going away. Market expectations will continue to rise. But cost overruns, rework and preventable incidents are not inevitable.

If teams recognize that safety is not an add-on but a stabilizing force in a fast moving environment, schedules stay predictable, risks stay controlled and projects finish with stronger margins. Safety professionals, whether internal or from a partner like SCT Operations, are not overhead. They are one of the most reliable ways to protect both people and profitability.

Protect People. Power Production.

Ready to Strengthen Safety at Your Location?

From inspections and assessments to on-site staffing, SCT is ready to keep your operations running safely every shift, every day.